Volume 3 Appendices

Volume 3 Appendices
Appendix 1.1 – LBH Scoping Response ELSEF
Appendix 1.2/GLA Pre-Application Advice
Appendix 1.2/LBH Pre-Application Advice
Appendix 6.1 Air Quality Assessment Report
Appendix 6.1/Appendix 6.1 Air Quality Assessment Report_Part 1
Appendix 6.1/Appendix 6.1 Air Quality Assessment Report_Part 2
Appendix 6.1/Appendix 6.1 Air Quality Assessment Report_Part 3
Appendix 6.1/Appendix 6.1 Air Quality Assessment Report_Part 4
Appendix 6.1/Appendix 6.1 Air Quality Assessment Report_Part 5
Appendix 6.1/Appendix 6.1 Air Quality Assessment Report_Part 6
Appendix 6.1/Appendix 6.1 Air Quality Assessment Report_Part 7
Appendix 7.1 – Model Input Data
Appendix 7.2 – Consultation with the Environment Agency
Appendix 8.1 – TA/Appendix A/Appendix A Figure 1 Site Location Plan
Appendix 8.1 – TA/Appendix A/Appendix A Figure 2 Site Layout
Appendix 8.1 – TA/Appendix A/Appendix A Figure 3 Jenkins Lane
Appendix 8.1 – TA/Appendix A/Appendix A Figure 4 Frog Lane Access
Appendix 8.1 – TA/Appendix A/Appendix A Figure 5 Bus Map
Appendix 8.1 – TA/Appendix A/Appendix A Figure 6 Cycle Map
Appendix 8.1 – TA/Appendix A/Appendix A Figure 7 ATC Location
Appendix 8.1 – TA/Appendix B/Appendix B ELSEF – Transport Assessment Scoping Report
Appendix 8.1 – TA/Appendix C/Appendix C 2917 Marsh Way ATC Eastbound
Appendix 8.1 – TA/Appendix C/Appendix C 2917 Marsh Way ATC Westbound
Appendix 8.1 – TA/Appendix C/Appendix C ARX classification sheet
Appendix 8.1 – TA/Appendix D/Appendix D Figure D1 Base AADT
Appendix 8.1 – TA/Appendix D/Appendix D Figure D10 Proposed Daily
Appendix 8.1 – TA/Appendix D/Appendix D Figure D11 Proposed AM
Appendix 8.1 – TA/Appendix D/Appendix D Figure D12 Proposed PM
Appendix 8.1 – TA/Appendix D/Appendix D Figure D13 Frog Lane Jct 2025 Base + Dev AM
Appendix 8.1 – TA/Appendix D/Appendix D Figure D14 Frog Lane Jct 2025 Base + Dev PM
Appendix 8.1 – TA/Appendix D/Appendix D Figure D2 Base AM
Appendix 8.1 – TA/Appendix D/Appendix D Figure D3 Base PM
Appendix 8.1 – TA/Appendix D/Appendix D Figure D4 2025 Base AADT
Appendix 8.1 – TA/Appendix D/Appendix D Figure D5 2025 Base AM
Appendix 8.1 – TA/Appendix D/Appendix D Figure D6 2025 Base PM
Appendix 8.1 – TA/Appendix D/Appendix D Figure D7 Consented 12 hr
Appendix 8.1 – TA/Appendix D/Appendix D Figure D8 Consent AM
Appendix 8.1 – TA/Appendix D/Appendix D Figure D9 Consent PM
Appendix 8.1 – TA/Appendix E/Appendix E Figure 1 Project Eagle Traffic Flows
Appendix 8.1 – TA/Appendix F/Appendix F Accident Analysis
Appendix 8.1 – TA/Appendix G/Appendix G Traffic Generation
Appendix 8.1 – TA/Appendix H/Appendix H 2012 AM & PM + Development
Appendix 8.1 – TA/Appendix H/Appendix H 2025 AM & PM + Development
Appendix 8.1 – TA/ELSEF Transport Assessment Final
Appendix 8.2 – Travel Plan/Appendix A Figure 1 Site Location Plan
Appendix 8.2 – Travel Plan/Appendix A Figure 2 Cycle Map
Appendix 8.2 – Travel Plan/Appendix A Figure 3 PT Map
Appendix 8.2 – Travel Plan/ELSEF Travel Plan Final
Appendix 9.1 – Monitoring data sumary appendix
Appendix 9.2_Noise levels of onsite equipment/Appendix 9.2_Noise proposed_a
Appendix 9.2_Noise levels of onsite equipment/Appendix 9.2_Noise proposed_b
Appendix 9.3_Vehicle Movements/Appendix 9.3_a
Appendix 9.3_Vehicle Movements/Appendix 9.3_b
Appendix 9.3_Vehicle Movements/Appendix 9.3_c
Appendix 9.3_Vehicle Movements/Appendix 9.3_d
Appendix 9.3_Vehicle Movements/Appendix 9.3_e
Appendix 9.3_Vehicle Movements/Appendix 9.3_f
Appendix 9.3_Vehicle Movements/Appendix 9.3_g
Appendix 9.3_Vehicle Movements/Appendix 9.3_h
Appendix 9.3_Vehicle Movements/Appendix 9.3_i
Appendix 10.1
Appendix 10.2
Appendix 11.1 – 2005 Phase I Survey
Appendix 12.1/Final Geo-Environmental Interpretative Report incl appendices
Appendix 13.1 – FRA/App1 – EA Data
Appendix 13.1 – FRA/App2 – Proposed Site Layout
Appendix 13.1 – FRA/App3 – Topo
Appendix 13.1 – FRA/App4 – Flood Defence Drawings
Appendix 13.1 – FRA/App4 – Visual Inspection of Flood Defence Measures
Appendix 13.1 – FRA/App5 – Infil
Appendix 13.1 – FRA/App6 – No Infil
Appendix 13.1 – FRA/DWG1
Appendix 13.1 – FRA/DWG2
Appendix 13.1 – FRA/DWG3
Appendix 13.1 – FRA/DWG4
Appendix 13.1 – FRA/DWG5
Appendix 13.1 – FRA/DWG6
Appendix 13.1 – FRA/DWG7
Appendix 13.1 – FRA/DWG8
Appendix 13.1 – FRA/DWG9
Appendix 13.1 – FRA/ELSEF_FRA
Appendix 13.1 – FRA/ELSEF_FRA
Appendix 14.1
Appendix 14.2
Appendix 14.3